Four Hänel Lean-Lift® systems serve as ergonomic pallet storage
for network construction and maintenance
Heavy and bulky spare parts as well as components needed for repairs can be compactly stored in the Hänel Lean-Lift® systems. Pre-picked pallets are readily available to the service teams for the next deployment
Based in Kerns, Elektrizitätswerk Obwalden (EWO) is a regional energy service provider, which operates its own infrastructure. The company relies on four pallet-based Hänel Lean-Lift® systems for storing network construction and maintenance supplies. The vertical storage systems compactly store complete Euro pallets and make them readily available for the service and installation teams.
The vertical storage systems make optimal use of the entire floor-to-ceiling height in the warehouse, delivering high storage capacity within a small footprint. At the same time, the enclosed design reliably protects the stored items from dust, dirt, and unauthorized access. This eliminates the need for conventional high-bay storage with forklifts.
Direct supply of pallets for outdoor use
Complete Euro pallets with a capacity of up to 1,000 kg can be effortlessly loaded and unloaded directly at ground level using a pallet truck. When pallets are requested at the Hänel MP 14 N lift controller, the extractor brings them directly to the user for retrieval at the access point, where the supplies needed for repairs or maintenance work can then be collected directly using the pallet truck.
The storage systems are equipped with the Hänel ESB redundancy system to ensure high system availability. This means that availability of materials required for repairs and maintenance work can be reliably ensured.
The Hänel pallet storage solution combines maximum utilization of available space, short access times, and direct supply of complete pallets for efficient deployment of service teams.
“Every second counts with critical infrastructure. Thanks to the Hänel Lean-Lift® pallet storage system, we have constant access to all critical components. This means that our response teams receive the items they need quickly and fully, without any delay.“
Rolf Niederberger
Department Head of Infrastructure Services at Elektrizitätswerk Obwalden